Featured News
Featured Articles


Integrated vs. Fragmented
Integrated vs. fragmented solutions for geothermal supervisory control and data acquisition (SCADA)
Read More
Avoiding common ‘Sins’ of Ground Heat Exchanger Design and Operation: A Cautionary Series

Introduction: The Seven Deadly Sins
Avoid the 'Seven Deadly Sins' of GSHP system design and operation
Read More
Lust: The Temptation to Oversize and Overpay
Optimizing GSHP efficiency: Balance loads using predictive control
Read More
Gluttony: Pushing Limits and Undermining Efficiency
How to prevent GSHP overuse and monitor performance effectively
Read More
Greed: Saving Now, Paying Later with Poor Performance
Avoid short-term cost cutting; ensure long-term efficiency and savings
Read More
Sloth: Neglect Leads to Inefficiency and Cost
Best practices for GSHP design and predictive monitoring
Read More
Pride: Overconfident and Overdesigned
Optimize GSHP design: Avoid oversizing and costly mistakes
Read More
Envy: Longing for the Familiar
Learn how GSHPs rely on annual energy exchange, making both total and peak loads equally important
Read More
Wrath: Frustration From the Unknown
Overcoming GSHP design challenges with guidance and monitoring
Read MoreReal-world example, the consequences of the mistake, and how it could have been prevented.